Trent Severn Waterway Dam Reconstructions

PreviousNext

Beginning March 2019, the Dufferin Concrete Peterborough plant has  supplied concrete to EBC Inc. for three project sites on the Trent Severn Waterway. The project consists of the reconstruction of three dams.

The Dam at Lock 23 Otonabee is located in the very north of the City of Peterborough. Lock 23 is part of a run of 5 locks that take boaters from Lakefield to Peterborough along the Otonabee River. This site also has an intake for the hydro power generating facility, run by Peterborough Utilities, located downstream at Lock 22. This major project will see the full replacement of the dam with a new structure. Not only will this work provide a new dam with an expected lifespan of more than 60 years, it will also reduce leakage and increase the safety of water management operators and the public.

Douro Dam at Lock 24 is a concrete dam that was constructed over 90 years ago. This project will include the design and construction of a new dam. This will eliminate leakage and make it safer for operators to make water level changes, ultimately improving water management capability on the Otonabee River.

Sawers Creek Dam at Lock 25 is a concrete dam that was constructed over 80 years ago. This project will include the design and construction of a new dam. This will eliminate leakage and make it safer for operators to make water level changes, ultimately improving water management capability on the Otonabee River.

Multiple pours for retaining walls, piers and spillways were completed from 50 m3 to 400m3, and Phase 1 was finished just before the deadline of March 31. Phase 2 is underway for the Otonabee and Douro dams and the second phase for the Sawers Creek Dam will continue through the winter of 2021.

Dufferin Concrete Technical Services (Andrei Muresan and his team) in collaboration with our R&D division (Bill Gong and his team) advised the client and the project owner to allow for a change in cementing materials to achieve the project specification on heat of hydration. The specification called for low heat cement to be used due to the elements being poured (concrete ranged up to 2m in thickness), the peak temperature requirement was a maximum 65 degrees Celsius. Our team proposed and demonstrated the use of high % of slag cement combined with GU to achieve these requirements. This involved adiabatic testing to model the concrete mix performance.

Dufferin Concrete continues to work closely with EBC Inc. to manage the three individual sites and ensure coordinated scheduling of the pours.

Share this entry
  • Share on Facebook
  • Share on Twitter
  • Share on Google+
  • Share on Pinterest
  • Share on Linkedin
  • Share on Tumblr
  • Share on Vk
  • Share on Reddit
  • Share by Mail

© Copyright - Dufferin Concrete, a division of CRH Canada Group Inc.
  • Linkedin
  • Youtube

Our use of cookies

We use cookies to make this site work and to help us make improvements. Clicking accept will enable us to set recommended analytics cookies.

Our use of cookies

We use essential cookies to make our site work. We'd also like to set optional analytics cookies to help us improve it. We won't set optional cookies unless you enable them. Using this tool will set a cookie on your device to remember your preferences. For more detailed information about the cookies we use, see our Privacy & Cookies page.

Essential cookies

Essential cookies enable core functionality such as security, network management, and accessibility. You may disable these by changing your browser settings, but this may affect how the website functions.

Analytics cookies

We'd like to set Google Analytics cookies to help us to improve our website by collecting and reporting information on how you use it. The cookies collect information in a way that does not directly identify anyone. For more information on how these cookies work, please see our Privacy & Cookies page.

Chat with a local Customer Experience representative from our Team via Text message